Project: mhlRV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Mark Larsen   -  
Project:   Vans - RV-14A
Total Hours:1661.5
Total Flight Time:
Start/Last Date:Sep 21, 2020 - No Finish Date
Engine:Lycoming YIO-390-EXP119 (YENPL-RT2E11172)
 
Friendly URL: https://eaabuilderslog.org?s=mhlRV14A

Home or Last Project Picture

Nov 22, 2020     First Actual Rivets! - (1.3 hours)       Category: 6 Vertical Stab
I reached another milestone today – the first actual rivet installed! I riveted the vertical stabilizer forward spar doubler to the forward spar. This step included 6 AN426 rivets set flush on the aft side of the spar and 4 AN470 rivets also set with the manufactured head on the aft side of the spar. I used the pneumatic squeezer to install the rivets with good results.

I finished the session by clecoing the rear spar, rear spar doubler, and hinge brackets together for the next riveting step.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.